Our team performs on-site surveys to collect critical data on water flow, elevation, and site conditions. This ensures that projects are based on accurate, real-world measurements.
Preliminary Site Survey is part of PT Entec Indonesia’s Hydropower Consulting & Engineering services, alongside Mini & Micro Hydropower Site Assessment, Pre and Full Feasibility Study, Detailed Engineering Design (DED) & Bill of Quantity (BoQ), Financial Analysis. We prioritize sustainability, efficiency, and economic viability in all our projects.
Discuss Your ProjectA preliminary survey replaces estimates with measured numbers — topography, hydrology and geology firm enough to size the scheme, choose a layout and cost it without major surprises during construction.
Flow is gauged with the method that fits the stream: bucket-and-stopwatch for small flows, the float or velocity-area method, a current meter, salt dilution for turbulent mountain streams, or a temporary measuring weir. A single measurement is not a hydrology, so gaugings are repeated — ideally across seasons and at minimum in the dry season — and correlated with rainfall-runoff modelling to build a flow duration curve. Head is measured with an engineer's level, a water-filled hose or a clinometer and tape, and the survey records profiles along the waterway, foundation conditions, flood marks and sediment.
What you receive: a survey report and drawings: site plan and profiles, the measured head, gauging records, a preliminary flow duration curve and dependable flow, geology and foundation notes, and a recommended layout.